Mr Bathroom Remodeling Houston
A new bathroom needs to work for how you actually live. We plan the job around solid plumbing, good waterproofing, and materials that hold up to daily use.
- Phones answered seven days
- Written quote with schedule
- Tile, tubs & vanities

Talk to us about your bathroom
- We answer 8am to 9pm daily
- We come out and walk through
- You get a written quote
Phones answered 8am – 9pm
Our services
Full Bathroom Remodel
We strip the room to the studs and rebuild it. Flooring, walls, ceiling, fixtures, and trim all get replaced.
Ask about this →Shower Remodels & Walk-In Conversions
We remove the old shower pan or tub and build a walk-in shower with a poured pan, backer board, and tile.
Ask about this →Tub-to-Shower Conversion
We pull the bathtub, cap the extra drain, and frame a shower in the same footprint. Good choice for the only full bath in the house.
Ask about this →Tub Replacement
We swap an old tub for a new alcove or freestanding tub. The surrounding walls get new backer board and tile or a solid surround.
Ask about this →Vanity & Countertop Install
We set a new vanity cabinet, top, sink, and faucet. Plumbing connections are brought up to code at the same time.
Ask about this →Accessibility Updates
We add blocking for grab bars, swap to curbless showers, install comfort-height toilets, and widen door openings where the layout allows.
Ask about this →Know what you want changed? Call us
Tell us about the bathroom and we'll set up a walkthrough.
Projects We Take On
- Primary BathAttached to the main bedroom, often with a larger footprint.
- Hall or Guest BathShared by bedrooms, usually a tub-shower combo layout.
- Half Bath or Powder RoomToilet and sink only, often on the main floor.
- Accessible BathBuilt for wheelchair access, low thresholds, and grab support.
What We Check on the First Walkthrough
We look at what's behind the walls and under the floor before we talk about tile colors. These checks let us give you a firm written quote.
Call (281) 270-2130- Plumbing LocationsWe note where supply lines and drain stacks sit so we can price moving them.
- Subfloor ConditionWe look for soft spots, rot, or deflection around the toilet and tub.
- Ventilation FanWe check duct routing and CFM to see if it actually pulls moisture out.
- Electrical & GFCIWe test outlets and confirm the circuit has ground-fault protection.
- Waterproofing Behind TileWe look for cracked grout, loose tiles, or drywall behind wet areas.
- Layout & ClearanceWe measure door swing, toilet clearance, and shower entry width.
From the first call to the finished job
Walkthrough & Quote
We come out, check the room, and give you a written quote with a project schedule. No pricing over the phone.
Material Selection
You pick your tile, vanity, tub or shower base, and fixtures. We order everything and store it until start day.
Demolition & Rough-In
We tear out the old surfaces, move plumbing if needed, update wiring, and hang backer board.
Finish & Trim
We set tile, install the vanity and toilet, hang the mirror, and caulk everything. You get a final walkthrough when we're done.
Ready for a walkthrough? Call us now
We walk through your bathroom, give you a written quote with a schedule, and handle ordering materials.
Signs It's Time for a Remodel
Grout cracks keep coming back and the tile feels spongy underfoot.
The exhaust fan leaves the mirror fogged for an hour after a shower.
You smell musty odors that don't go away with cleaning.
The tub or shower floor is stained, chipped, or patched with caulk.
Someone in the house needs grab bars or a curbless shower entry.
The vanity drawers stick and the countertop is swollen at the seams.
Common questions
Still have questions?
Call us to talk it through. We answer 8am to 9pm, seven days a week.
Call (281) 270-2130How long does a bathroom remodel take?
It depends on the scope. A tub-to-shower conversion moves faster than a full gut with plumbing changes. We give you a schedule with the written quote so you know the timeline before we start.
Can we keep using the house during the work?
You can stay in the house. We set up dust barriers and clean the path to the door each day. The one bathroom we're working in will be out of use until the job is done, so plan around that if it's your only full bath.
When can I call?
Phones are answered from 8am to 9pm, seven days a week.
Do I need to buy the materials myself?
We order the tile, backer board, setting materials and plumbing fixtures for the job. You choose the finishes, and we have everything ready before work starts.
What if you find rot or bad plumbing during demo?
We stop and show you what we found. The written quote covers what we can see. If we open the wall and find a vent stack that needs replacing or a rotted joist, we price the fix separately before we do any extra work.
Ready to talk about your bathroom?
(281) 270-2130Call us to set up a walkthrough and get a written quote with a schedule. Open 8am – 9pm, every day of the week.
Phone, address & hours
Mr Bathroom Remodeling Houston1301 McKinney St
Houston, TX 77010
Open 8am – 9pm, every day of the week.
Call (281) 270-2130